Guyatt Park Ferry Terminal, Brisbane

Project Info

  • Construction Date

    2019

  • Category

    Balustrade Project, Commercial Projects

  • Location

    Guyatt Park, St Lucia

Guyatt Park Ferry Terminal.

 

Our Role:

Southern Stainless fabricated and installed stainless steel, aluminium and steel components all with an extremely high-quality finish.

All stainless steel used was 316 marine grade and mechanically polished to 1000g, then fully electropolished after fabrication creating a surface smoothness of  <0.2mm Ra, which increases the stainless's durability and resistance to tea staining.

This project consisted of:

  • Balustrade glazing posts from 16mm plate with 13.52mm with toughened laminate glass infill
    • The glass also included invisi-sheild coating that gives self-cleaning properties to the glass surface
  • Sliding and swinging gates with Makrolon polycarbonate infill panels
    • The rollers for the sliding gates were custom machined in-house from solid 316 stainless steel
  • 16mm 5083 grade aluminium gangway cover plates
  • 4mm 5083 aluminium and steel balustrades for rest area viewing window surrounds
    • Included a heavy duty 3 coat paint system in colours Venezia Gold and Falzonal A
  • Stainless steel rest area seat frame
  • Re-furbished existing mesh panels and handrails feature via mechanical and electropolishing

 

About Guyatt Park Ferry Terminal:

The upgraded ferry terminal will feature improved accessibility for all passengers and will increase the terminal capacity to cater for current and future demand.