Catalina Riverwalk, Brisbane

Project Info

  • Construction Date

    Finished 2018

  • Category

    Projects

  • Location

    Brisbane

Works commenced in September 2017 and completed in March 2018.

 

Our Role

Southern Stainless manufactured and installed 700 metres of stainless steel balustrade and also manufactured and supplied the bridge connections for the bridge remediation works.

Stainless balustrade specifications:

  • 25mm thick 316 stainless steel base plates
  • 16mm thick 316 stainless steel stanchions
  • 50 diameter x 3mm thick horizontal top and bottom rails with 32 diameter x 3mm vertical balusters
  • 76 diameter x 3mm thick top rail
  • Engineered welds 6mm and 3mm fillet
  • Balustrades fully electropolished in house after fabrication and prior to installation

 

About Brisbane Catalina Riverwalk

The Catalina Riverwalk required remediation work to ensure the life of the structure and that it remains safe and serviceable, without restrictions, for the benefit of users.

Take a walk through this project below: